Hamish Stirling
Edmonton · hamish.stirling@example.com
4 November 2026
Ms. Priya Halvorsen
Principal Engineer
Beaumont Valley Engineering
Subject: Application for Civil Engineer, Municipal Infrastructure
Dear Ms. Halvorsen,
Agreeing review dates with the city before design starts has kept 22 of my last 24 projects on time. I am a professional engineer registered with APEGA since 2024, with seven years in municipal and commercial work, and I am applying for the Civil Engineer, Municipal Infrastructure role at Beaumont Valley Engineering.
At Prairie Municipal Engineering I design stormwater, road and utility upgrades for about 12 municipal projects a year, worth about $18 million in total, in Civil 3D and PCSWMM. On a 1.4 km road reconstruction I redesigned the base layer and cut its cost by 11%. Every tender drawing and quantity list leaves my desk with a checker's sign-off on each sheet, and contractor submissions and site queries get an answer within two working days.
Beaumont Valley Engineering's new five-year stormwater program is the work I most want to be doing. Stormwater is where most of my design time has gone, and a program that runs for years rewards the habits I already keep: dates agreed early, drawings checked sheet by sheet, and an engineer who visits sites to review progress every week and writes up issues in a short report the client can read in minutes. As a junior engineer I also arranged geotechnical tests on 12 sites, so I ask about ground conditions before I draw.
A sample site report, with client details removed, is ready to send before we meet. My own question for the interview is how your team sets review dates with a town when the work runs over several years.
Sincerely,
Hamish Stirling